MARATHON ROUGE RIVER  MI

OWNER:                                           Marathon

 

 

 

 

ENGINEER                                   

Contact:                                          

DREDGING CONTRACTOR:      Faust Corporation 

Contact:                                           Marc Faust 

                                                   

 

CONTRACT DETAILS

 

Contract Duration:                         1 Week      

 

 

SCOPE of WORK:              Conduct Pre & Post Dredge Surveys

                                                Dredge sediment to -21 LWD

                                                Transport sediment to Rouge River CDF

                                               

                                               

 

PROJECT OVERVIEW:

Faust Corporation was contracted to remove sediment from dock area at the Marathon bulk Transfer facility on the Rouge River. Dredged approximately 3500 cubic yards of silty material and transported the material to the Rouge River CDF

 Marathon Bulk Transfer Facility