OWNER:                      DTE

                                               

 

GENERAL CONTRACTOR:         DTE

Contact:                                              John Decator

 

PILING CONTRACTOR:               Faust Corporation

Contact:                                             Marc Faust

                                                            586) 445-2030

  

CONTRACT DETAILS                                                                   

 

Contract Duration:             4 Months      

  

Scope of Work:                   Remove Old Retaining Walls

                                                Install New Retaining Walls

                                                Install Equalization Canal

                                                Install Walkways

St Clair Power Plant
St Clair Michigan

PROJECT OVERVIEW:

Faust Corporation removed existing sheet pile retaining walls from around two ash settling ponds and replaced the old piling with 42,000 square feet of new sheet piling. Additionally Faust constructed an equalization canal between the two ponds and constructed a walkway across the canal.  The project also called for the installation of a new walkway/bridge across the settling ponds and the installation of

guardrails.

St. Clair Power Plant - St. Clair Michigan